lee201283
|
posted on 15/4/03 at 06:32 PM |
|
|
propshaft
when i removed the rubber donout of the end of the prop shaft, the gearbox shaft has only got 3 bolt holes when i need 5, to attach the propshaft
withot the rubber donout how do i over come this problem
|
|
|
PaulBuz
|
posted on 15/4/03 at 07:13 PM |
|
|
What g/box?
MT75?
Cheers
Paul
|
|
lee201283
|
posted on 15/4/03 at 07:33 PM |
|
|
type 9
type 9
|
|
Stu16v
|
posted on 15/4/03 at 11:31 PM |
|
|
....by finding a sliding joint that has UJs instead of the rubber donut. Getting rare in scrappys nowadays, but most propshaft companys will knock a
brand new one up to length for under 100GBP.
HTH Stu.
Dont just build it.....make it!
|
|
Mark Allanson
|
posted on 16/4/03 at 05:56 PM |
|
|
Just got one from a Capri, cost £5!, You can get U/V repair kit for £10 each, the front section looks like it might be exactly the right length!! or
is that just wishfull thinking - I could just put the diff flange straight onto the bearing U/V, - Life is never that straight forward!!
|
|