As the title says when do you all hope to have your pride and joy road legal, if you are still building as I am.
Hopefully this will also help push 'Where is...' down the list
cheers
ricky
i'de like to see mine it's been hiding in a mates garage for nearly 12 months whilst i get the noble built i'm hoping to have noble finished early in te new year and get the luego done for summer i hope
Hope to SVA my Viento over Christmas. The car is up and running just needs a rear brake fluid leak sorting and some trim.
Oh and a chassis plate making – must buy some punches…..
Paul.
edit - its taken 3 1/2 years to get to this stage
[Edited on 11/11/07 by Paul (Notts)]
Rescued attachment nov06 164.jpg
i recon on about 2 moor years i could do it quicker but not a standed that i would be happy with
engine is only a mockup unit
[Edited on 11/11/07 by repper]
hope to have the viper powered beast done for spring 2008,
l'm hoping (the great god of cash willing) and trying to work towards getting mine on the road for Stoneleigh 2008. When she is finished I want to call her Bumble.
I think the key is to not rush at it. It'll take some time and it's a shame to resent spending all your time on the car when you'ld
rather be doing something else.... Just plod away at it as and when the mood strikes and you'll get it done eventually
Then again, it took me 4 and a half years
Hope to be on the road next spring. Im about to fit a new kitchen at home so will have to divide any spare time between house and workshop!
Next job is ordering the wheels, more expense! At first rough measure it looks like 265s might fit?
kenton
Kenton, 255 on my rears (on 9" wide wheels) - Just enough clearance on inside and about 1/2 inch in from outer edge of rear wing so 265 would take it to the limit before you'd need wider rear wings...
aiming for next summer but money will be a big factor!
Dave B
aiming for christmas, or january at the latest.
only a Prop, dash, clocks and rear panel left to do.
optional extras are cossie front brakes ( cause im vain )
hopefully mine will be ready for sva early next year. even though only thing luego i have is chassis and pedal box!!
Around the begining of next year.
I would like mine ready for April 2009, but all depends on the cash flow,and how many parts i can get manufactured to reduce the build time
John
Im looking at sometime over Xmas or jan as well. And as well as some of you (and as bob, donut, james, chrisW and theconrodkid will attest to) its
taken me a while....... 4.5yrs and counting.
Cheers
Fin
Aiming to have mine on the road for next spring. I have spent most off this year building a new garage for it and now that its finished i can concentrate on the car. i have spent 4 years on it so far and now cant wait to get it on the road.
Well done all you guys.
That will strengthen the Luego owners club.
Well I've just had a count up of this post and so you will have to look at my returning post.