Eds zx12r mkindy almost sva ready.
[Edited on 26/11/08 by ragindave]
looks tidy. I think someone spilled some green paint on it by accident though?
Looks very smart.
One question though - is it SVA acceptable to have footwells open to the engine bay?
Even if it is you may want to consider isolating the footwells on the grounds that any fuel or hot coolant which leaks will at least be prevented from
cooking your feet. Rumour has it that one WL locoster lost part of his ankle after it became drenched with hot coolant containing anti-freeze which
then infected his ankle.
Just a thought.
Cheers, Pewe
love the colour .. that cage is a work of art
Nice work, agree about the fluids though.
well as i can see the riv nuts in the scuttle i think ed still needs to fit the battery tray
Provided Mr SVA man is supplied sunglasses that's a sure pass.
looks great, lot of time and effort gone into a class looking build.
10/10 from here.
Top quality job,the wiring looks very neat and tidy behind that dash
Yes the front of the scuttle is off so is fully enclosed foot wells when fitted the battery is monuted in the passenger footwell.
It is one of the best finished kit cars I have seen looks even better in the flesh!
more pictures online if you want to have a look.
http://s110.photobucket.com/albums/n81/ragindave/
Green aint my thang, but it looks a very well executed build.
Good luck with SVA
Excellent! I love lairy colours! I think these cars really suit this style!
fantastic looking car, wish my wiring was that neat
Looks fantastic, not got my kit yet but gives me inspiration.
Good luck with the SVA
Sva now booked 22nd December,better get busy this weekend.