nitram38
|
posted on 8/2/09 at 11:34 AM |
|
|
SVA..remote chance
There is a remote chance that I could make the SVA application date, but it is very remote!
If I do get my forms in on time (28th Feb), do you think that I can ask for a date in April (towards the end of the sva test)?
I still have a lot to do on the car, but it might be do-able.
Cheers Martin
|
|
|
blakep82
|
posted on 8/2/09 at 11:35 AM |
|
|
was considering this myself. i decided it wasn't worth the risk. I'm trying to forget about the fees...
________________________
IVA manual link http://www.businesslink.gov.uk/bdotg/action/detail?type=RESOURCES&itemId=1081997083
don't write OT on a new thread title, you're creating the topic, everything you write is very much ON topic!
|
|
rusty nuts
|
posted on 8/2/09 at 11:38 AM |
|
|
If the car is nearly complete then it may be worth it , if it fails you still have 6 months to get it retested under SVA rules if what I've read
is correct . If the car isn't complete the tester may refuse to test?
|
|
Bitten hero
|
posted on 8/2/09 at 12:28 PM |
|
|
HI martin , i was thinking the same thing but it looks like just too tight to get it all done ,just have to accept that the cost is going to be much
higher re the test-robbing bars****!!!!!!!!!!!.its only money after all!!!!!!!!
|
|
theconrodkid
|
posted on 8/2/09 at 12:38 PM |
|
|
i got a news letter from vosa for some unknown reason,it says "vehicles must be presented in completed condition and driven under their own
power or test will be canceled and iva must be applied for,can scan if you need it
who cares who wins
pass the pork pies
|
|
cloudy
|
posted on 8/2/09 at 12:51 PM |
|
|
Hi Martin, yes I've heard of people still getting april dates, just put down a good range in the form to increase your chances (I gave a two
week range) and get the paperwork in monday for sure! Any Q's on the paperwork drop me a U2U
All you have to do is produce a working car, fail then use 6months to complete it...
James
www.warnercars.com
|
|
nitram38
|
posted on 8/2/09 at 01:10 PM |
|
|
I'm going to get as much as I can get done this week.
The wiring and plumbing are in, but I need to put all the plugs/wrap on and solder the immobiliser connections, wire the dash, fit the air
compressor, adjust the suspension (close enough), fit the air shocks.
The brake and clutch lines are in but need filling/bleeding. Throttle cable inner needs soldering and cutting. I need to make a top panel for my nose
cone and a tube frame to support it. I'm waiting for my top scuttle to be welded (for my bubble screens) and on GB engineering to send me my
driveshafts.
If I get the April date, then no problem.
|
|
Dangle_kt
|
posted on 8/2/09 at 01:23 PM |
|
|
Hi,
I asked for the last week in april, I got the 24th April.
The closer it gets the less option to get the dates you want.
|
|