Printable Version | Subscribe | Add to Favourites
New Topic New Poll New Reply
Author: Subject: Hardest thing so far
RichardK

posted on 1/5/06 at 02:00 PM Reply With Quote
Hardest thing so far

Finally got my hub carriers finished, these have so far been the hardest thing to make and have taken me about 8 hours in total, hack sawing the hub carrier face place from the original hubs seemed to be the thing that took me the longest, plenty of tea breaks, thinking about it I probably had about 2 hours in breaks Anyway I felt like I was onto a winner so made a rivnut tool as well then my gas ran out Anyway have a look / marvel at my hub carriers, comments are welcome, haven't put on the brackets for the shockers on the backs as I thought I may have to slightly adjust their position when everything is bolted together so thought I would leave till last.

My Picture Gallery

Cheers

Rich

View User's Profile E-Mail User Visit User's Homepage View All Posts By User U2U Member

New Topic New Poll New Reply


go to top






Website design and SEO by Studio Montage

All content © 2001-16 LocostBuilders. Reproduction prohibited
Opinions expressed in public posts are those of the author and do not necessarily represent
the views of other users or any member of the LocostBuilders team.
Running XMB 1.8 Partagium [© 2002 XMB Group] on Apache under CentOS Linux
Founded, built and operated by ChrisW.