Board logo

Number plates and ECU's
johnemms - 3/10/12 at 03:31 PM

Well.. so far...

After an IVA pass at Derby on Wednesday 26th Sep..
I got my DVLA papers in on Thursday 27th Sep..

Got a call today 2nd Oct -DVLA B'Ham - need to inspect car - best date - 16th Oct

Been looking for a Megajolt system .. not found one

However- better than that !
I've goten a prototype NODIZ Pro™ Complete Package
No need for an EDIS module either..
also blutooth dongle.. stick phone on dash and adjust stuff!!

Full & final version to be released 'very' soon..

•NODIZPro ECU with fully terminated 'click and go' loom.
•Crank Sensor, Coil Pack and Leads (4 Cylinder)
•36-1 Universal Trigger Wheel


Features..

Gives me somthing to play with while waiting for my number plates!!


chillis - 3/10/12 at 05:53 PM

Be interested to see what Brent at Autosport labs thinks of it as Mtech were ripping his megajolt off a while back, looks like they might be still at it.


daviep - 3/10/12 at 06:05 PM

quote:
Originally posted by chillis
Be interested to see what Brent at Autosport labs thinks of it as Mtech were ripping his megajolt off a while back, looks like they might be still at it.


Is that based on anything or are you just trying to stir up some trouble?


Ben_Copeland - 3/10/12 at 06:27 PM

I've seen it doesn't look anything like a megajolt or use the same components/connectors.


johnemms - 3/10/12 at 06:53 PM

I'll try n post pics n stuff as i fit it and keep peeps informed here..
I think it has so much more to offer - I just need a good ignition system!


mtechmatt - 4/10/12 at 07:59 AM

Considering it has in buillt coil drivers and VR decoder, wherin the MJ needs EDIS modules to do the hardwork, I fail to see your reasoning on the 'ripping off' point....

Ben, Cheers for the post, at least yours is based on your eyesight and intelligence

John,

Will be hoping to ship one to you tomorrow, remember it is one of the prototype batch so would really appreciate any feedback you may have on it...

Regards,
Matt


mtechmatt - 7/10/12 at 11:26 AM

John,

Yours will be with you monday... Let me know your initial thoughts on the unit.

I suggest you wire in 2D mode for now, to get it up and running, and add TPS after. Only 5 wires to connect

Be sure to tie the shield of the shielded cable to ground somewhere...



Once you have it all running, the unit will follows the '100%' load section of the map, to go fully 3D, wire your TPS as per the diagram below:




[Edited on 7/10/12 by mtechmatt]