if all gos to plan these should be avalable in about 3-4weeks,thay are jetted balanced,also have a pipacross filter,
also the fuel pump and reg if needed,
u2u me and we can sort out a price
also i have 3meters of stainless steel teflon brake line i also have a small lengh with 2 new banjos on
u2u
[Edited on 19/6/09 by jpindy3]
U2U on its way
Nick
you going to chuck in anything else