Printable Version | Subscribe | Add to Favourites
New Topic New Poll New Reply
Author: Subject: FS: Gas turbine project
tegwin

posted on 3/9/16 at 05:02 PM Reply With Quote
FS: Gas turbine project

I hate to admit defeat but what with running two companies and getting involved with girls I fear this is never going to get finished by me

Does anyone fancy a project for the winter?

There's over a grands worth of parts gone into this. Its so nearly there... The oil and fuel systems need completing and it should run! My plan was to build an electric starter system and make a fancy electronic control system but that just isnt going to happen now.

Its based around a hybrid KKK turbo with a gas pre-heat and high pressure direct diesel injection.

HP Fuel pump assembly:


Oil and fuel pumps with some pipes


combustor end cap with fuel, preheat and drain taps


Combustor pre-heat test


combustor... some serious work gone into this


inside combustor


Turbo and frame


assorted parts


Video of a low pressure combustor test here: https://vimeo.com/181320289

I can dig out all the parts and photograph them it anyone is really interested. There is a mounatin of valves, connectors, sensors etc.

[Edited on 3/9/16 by tegwin]





------------------------------------------------------------------------------------------------------------------------
Would the last person who leaves the country please switch off the lights and close the door!

www.verticalhorizonsmedia.tv

Is this a TRADE ADVERTISEMENT?? Click HERE to report it!

View User's Profile Visit User's Homepage View All Posts By User U2U Member

New Topic New Poll New Reply


go to top






Website design and SEO by Studio Montage

All content © 2001-16 LocostBuilders. Reproduction prohibited
Opinions expressed in public posts are those of the author and do not necessarily represent
the views of other users or any member of the LocostBuilders team.
Running XMB 1.8 Partagium [© 2002 XMB Group] on Apache under CentOS Linux
Founded, built and operated by ChrisW.