bassett
|
posted on 20/2/09 at 02:40 PM |
|
|
Got our SVA date March 30th
Hi all, After thinking the DVLA had lost our application we now have a date for the 30th of March. Im quite happy with the date we've got a
month and a week to;
fit the interior panels
fit the tunnel
Attach scuttle and switches(all wired up other than hazard warning light)
Attach bonnet clamps
Fix nose cone in place
fix wing stays
Fit the seats
Bleed Brakes
Move coolant hose away from bonnet
Fit MNR SVA kit
Quick test round private roads
Reading back thats quite a bit to do
Adam
[Edited on 20/2/09 by bassett]
My MNR Blog Updated Jan 2010 - Track Day Prep Begins!
|
|
|
jollygreengiant
|
posted on 20/2/09 at 02:50 PM |
|
|
Good luck, why you wasting time on here then.
Beware of the Goldfish in the tulip mines. The ONLY defence against them is smoking peanut butter sandwiches.
|
|
bassett
|
posted on 20/2/09 at 04:46 PM |
|
|
Because im in the offiice meant to be working
My MNR Blog Updated Jan 2010 - Track Day Prep Begins!
|
|
chris_smith
|
posted on 20/2/09 at 08:29 PM |
|
|
good luck you will easily finish it in time
how many days from posting forms to getting the date? just curious to when i can expect the call
chris
The secret of success is to know something nobody else knows."
|
|