Dave Bailey
|
posted on 25/7/08 at 10:57 PM |
|
|
Earth Point
Anyone drilled a hole through the firewall in the pasenger footwell and bolted studs in to get an earth point? I don't want to weld my chassis
with Studs.... having had it painted.... I know should have welded the studs in before...too late now!
Dave B
|
|
|
mangogrooveworkshop
|
posted on 25/7/08 at 11:00 PM |
|
|
drill and tap....stainless bolt is best
|
|
omega 24 v6
|
posted on 26/7/08 at 07:50 AM |
|
|
quote:
Anyone drilled a hole through the firewall in the pasenger footwell and bolted studs in to get an earth point? I don't want to weld my chassis
with Studs.... having had it painted.... I know should have welded the studs in before...too late now!
Yes me. 8mmbolt (head in pass footwell) spring washer and plai nut done up tight and the the terminals onto the remaing bolt and a washer/locknut to
secure. Then a spray of white grease for protection.
If it looks wrong it probably is wrong.
|
|
BenB
|
posted on 26/7/08 at 10:15 AM |
|
|
Personally I just drilled a hole in the chassis and used a coach screw to clamp the earth strap onto the chassis. The coach screw is in contact with
the thread it produces so you get a good contact....
No problems yet....
|
|
001Ben
|
posted on 26/7/08 at 10:42 AM |
|
|
why not use rivnut bits
|
|
coozer
|
posted on 26/7/08 at 03:01 PM |
|
|
Yep, my battery is down the side of the passenger footwell and the earth point is a short load bolted to the bulkhead. The same lead goes through to
the engine bay and is bolted to the engine block as well.
1972 V8 Jago
1980 Z750
|
|
tomblyth
|
posted on 26/7/08 at 06:06 PM |
|
|
see my photo's the battery is in the footwell! conections through the front!
|
|