Printable Version | Subscribe | Add to Favourites
New Topic New Reply
Author: Subject: Decision made
dave

posted on 18/11/11 at 05:25 PM Reply With Quote
Decision made

Decided to go for a full rebuild on my Tiger. A few bits have been annoying me since i built it years ago. I fitted new pedalbox and mx5 running gear and all the holes where the old exhaust etc was have never been fixed.

Would it be a good or bad idea to weld up all the rivet holes before fitting new panels.






View User's Profile View All Posts By User U2U Member
scootz

posted on 18/11/11 at 05:37 PM Reply With Quote
If you have the time and inclination, then I would weld them up! Means you can blast the chassis without having to fish all the 'shot' out, and means you don't have to faff around trying to match the new holes to the old!

I've had (ahem) a few kit-cars now and some have been riddled with excess holes in the chassis rails where someone's re-bodied it and missed the original holes!





It's Evolution Baby!

View User's Profile View All Posts By User U2U Member
pewe

posted on 18/11/11 at 05:42 PM Reply With Quote
Seems like a lot of work to do that but Scootz ^^ does have a point if you are intending to have it blasted..
Structurally it shouldn't make any difference.
I'd either measure the distance between existing holes (hopefully all consistent) and then drill new ones mid-way between.
Or once you've removed the old panels take a rubbing of the chassis holes on some thin card of the existing ones and line up the holes on the new panels by over-laying the rubbing on the new panel.
QED.
Cheers, Pewe

[Edited on 18/11/11 by pewe]

View User's Profile View All Posts By User U2U Member
scootz

posted on 18/11/11 at 05:47 PM Reply With Quote
quote:
Originally posted by pewe
Or once you've removed the old panels take a rubbing of the chassis holes on some thin card of the existing ones and line up the holes on the new panels by over-laying the rubbing on the new panel.
QED.


Good thinking batman!!!





It's Evolution Baby!

View User's Profile View All Posts By User U2U Member
dave

posted on 18/11/11 at 06:12 PM Reply With Quote
I put the panels on and know that they are all 6" apart. I will need to weld some of them up where i have put clips to hold pipes that have been moved.






View User's Profile View All Posts By User U2U Member
MakeEverything

posted on 18/11/11 at 06:32 PM Reply With Quote
I would just get it blasted, and drill big holes at the ends to remove the shot, and weld them up again. This would leave all the panel holes where they were.





Kindest Regards,
Richard.

...You can make it foolProof, but youll never make it Idiot Proof!...

View User's Profile E-Mail User View All Posts By User U2U Member
scootz

posted on 18/11/11 at 06:57 PM Reply With Quote
quote:
Originally posted by dave
I put the panels on and know that they are all 6" apart...


Someone might have moved them when you weren't looking!





It's Evolution Baby!

View User's Profile View All Posts By User U2U Member
dave

posted on 18/11/11 at 08:37 PM Reply With Quote
Its a possibility s'pose






View User's Profile View All Posts By User U2U Member

New Topic New Reply


go to top






Website design and SEO by Studio Montage

All content © 2001-16 LocostBuilders. Reproduction prohibited
Opinions expressed in public posts are those of the author and do not necessarily represent
the views of other users or any member of the LocostBuilders team.
Running XMB 1.8 Partagium [© 2002 XMB Group] on Apache under CentOS Linux
Founded, built and operated by ChrisW.