Printable Version | Subscribe | Add to Favourites
New Topic New Poll New Reply
Author: Subject: Extending (widening) my tarmac drive
Just

posted on 24/5/06 at 01:01 PM Reply With Quote
Extending (widening) my tarmac drive

As I have a single drive and garage I am planning to widen the current drive to double width. I have enough space between the current drive and the house to do it and the current drive is tarmac.

Does anyone know how much I should expect to pay someone to dig out the lawn, hardcore it and tarmac it with some brick paviers down one side?

Also, do I need to get any permissions from the council and do I need to drop the kerb further over to accomodate?

Would I be better to do the prep myself and just get someone to lay the tarmac or would it be as cheap to let someone do the lot?

View User's Profile View All Posts By User U2U Member
David Jenkins

posted on 24/5/06 at 01:14 PM Reply With Quote
Two suggestions:

Get a few quotes - it may be cheaper than you expect, and you won't break your back doing heavy labour.

Ring the local council planning office - they're usually very friendly, and should know the answers re legal requirements.

I have a double-width drive that needs re-surfacing. I was quoted around £2500 to dig it up and rebuild it, so that gives you a clue. Too expensive for me, so still looking at a patchy drive!

David






View User's Profile Visit User's Homepage View All Posts By User U2U Member
Lawnmower

posted on 24/5/06 at 02:37 PM Reply With Quote
A jcb 3cx or similar will cost about £200-250 for a days hire. (inc operator fuel etc.)
get a couple of 1 ton bags from jewsons deleiover, a skip, hire a wacker plate, shoul all cost about 400, plus tarmac.

View User's Profile View All Posts By User U2U Member
DarrenW

posted on 24/5/06 at 02:55 PM Reply With Quote
the option is to make the second drive out of paving slabs - two strips with maybe gravel in the centre.

I was lucky and got my big drive block paved by a local guy for not a lot of money (i had paths, walls etc done as well for 3500 all in, drive worked out about 1800.). I was surprised to find that patterned concrete and tarmac was a touch more. Most of the money goes into the labour and groundwork.

You may also be able to get the extra drive and your paths done in block paving. Will look good and may be cost effective.

All depends on what kind of house it is and what you want it to look like. There is always someone about with some spare to chuck down!! ive been told its not cheap to throw away.






View User's Profile E-Mail User View All Posts By User U2U Member
David Jenkins

posted on 24/5/06 at 02:59 PM Reply With Quote
Yes - preparation is the time-consumer, and time is the biggest cost. Materials are cheap in comparison.






View User's Profile Visit User's Homepage View All Posts By User U2U Member

New Topic New Poll New Reply


go to top






Website design and SEO by Studio Montage

All content © 2001-16 LocostBuilders. Reproduction prohibited
Opinions expressed in public posts are those of the author and do not necessarily represent
the views of other users or any member of the LocostBuilders team.
Running XMB 1.8 Partagium [© 2002 XMB Group] on Apache under CentOS Linux
Founded, built and operated by ChrisW.