Snuggs
|
posted on 6/5/06 at 02:51 PM |
|
|
Luego owners
Who's got what and at what stage. or or
----------------------------------------------------------------------------------------------------
http://www.topcashback.co.uk/ref/snuggstcb
Spider pig, spider pig, does whatever a spider pig does.
I doubt therefore I may be.
Luposlipophobia : Fear of being chased by wolves around a freshly waxed kitchen floor, while wearing only socks on your feet.
My mind not only wanders, sometimes it leaves completely!
http://www.venganza.org
http://www.jesusandmo.net/
http://www.snuggs.co.uk
|
|
|
hector
|
posted on 6/5/06 at 04:01 PM |
|
|
still building 1 year after purchase, just got dash/seats/harnesses/mirrors and trimming back panel then sort out edges for sva. Also preparing to put
Turbo Technics kit on after SVA-should be ready in couple of months I HOPE!!
cheers Colin
|
|
Andybarbet
|
posted on 6/5/06 at 04:17 PM |
|
|
Hi Snuggs,
I will definately have the bits off of you that we spoke about at Stoneleigh,bring them to newark and i will bring the cash with me, did you sell your
seats ?? they were more comfy than camping chairs thats for sure.
Well ive voted as just started my velocity build cos i have just got the donor parts back from shotblasting
Just gotta sort out a garage to build it in !!
Stoneleigh next year is my goal so will see how i do !
[Edited on 6/5/06 by Andybarbet]
|
|
Paul (Notts)
|
posted on 6/5/06 at 04:20 PM |
|
|
3.5 RV8 plan to be on the road end of next summer.
|
|
COREdevelopments
|
posted on 6/5/06 at 04:21 PM |
|
|
im still building after 2 years of having chassis, i finally got my arse in gear and actually doing some work. still a fair way off.
|
|
zzr1100rick
|
posted on 6/5/06 at 04:51 PM |
|
|
velocity builder getting there slowly
just ordered my body work from darren at GTS so hopefully will be pressing on soon
finish time who knows
|
|
Snuggs
|
posted on 6/5/06 at 05:06 PM |
|
|
quote: Originally posted by Andybarbet
Hi Snuggs,
I will definately have the bits off of you that we spoke about at Stoneleigh,bring them to newark and i will bring the cash with me, did you sell your
seats ?? they were more comfy than camping chairs thats for sure.
Well ive voted as just started my velocity build cos i have just got the donor parts back from shotblasting
Just gotta sort out a garage to build it in !!
Stoneleigh next year is my goal so will see how i do !
[Edited on 6/5/06 by Andybarbet]
Sold them 10 mins before I was going to stuff them in Geoff's tent to a young lad restoring a Jago jeep.
I will try to bring the wing stays to Newark if I remember but please remind me nearer the time as my memory is not what it used to be.
ps I sold the seats to a young lad restoring a Jago jeep.
Clive
----------------------------------------------------------------------------------------------------
http://www.topcashback.co.uk/ref/snuggstcb
Spider pig, spider pig, does whatever a spider pig does.
I doubt therefore I may be.
Luposlipophobia : Fear of being chased by wolves around a freshly waxed kitchen floor, while wearing only socks on your feet.
My mind not only wanders, sometimes it leaves completely!
http://www.venganza.org
http://www.jesusandmo.net/
http://www.snuggs.co.uk
|
|
richard thomas
|
posted on 6/5/06 at 05:11 PM |
|
|
Just finished a velocity with a hayabusa motor, awaiting SVA date.
Hope I never need reverse in traffic.....
|
|
Johnmor
|
posted on 6/5/06 at 05:55 PM |
|
|
Viento
Still building, trying to sort out dash and clocks, so far so good.
Maybe finish late summer.
|
|
andybod
|
posted on 6/5/06 at 06:13 PM |
|
|
collected velocity oct2004 still building hoping for late summer 200-
|
|
wilkingj
|
posted on 6/5/06 at 06:59 PM |
|
|
V8 Viento, Been Building for 18 months.
MoT'd last weekend, and SVA on Tuesday.
Just found a leaky brake union... NOT good with SVA in two days time, and no brake shops open on Sundays.
I think the male Nuts are too short and I need to remake the pipes with longer nuts. also got to remove the bloody calipers again to bleed up..
This could be my Braking problem we discussed earlier.
1. The point of a journey is not to arrive.
2. Never take life seriously. Nobody gets out alive anyway.
Best Regards
Geoff
http://www.v8viento.co.uk
|
|
wicket
|
posted on 6/5/06 at 08:06 PM |
|
|
Just finished a Locost except for a few cosmetic touches after 4 & a bit years, a good check over required & a clean and polish. SVA applied
for last week, asked for a date in early June.
|
|
pointy
|
posted on 6/5/06 at 08:16 PM |
|
|
Just finished (and I mean just) a Velocity. Taking it to MOT centre tomorrow for pre-SVA check on Tuesday. Taken about 2 years to
complete.
|
|
rjs
|
posted on 6/5/06 at 08:29 PM |
|
|
hi pointy
which sva centre are you taking your car to
|
|
Steve Lovelock
|
posted on 6/5/06 at 08:50 PM |
|
|
Building a Velocity, on and off for 18 months. Rolling chassis stage. Donor engine still in car but I think I've secured the use of a hoist
now so will get it out shortly. Once out I am still troubled by the prospect of joining it to a type 9. Once that is done I think it could be quite
quick to finish, say, urmm, at least a year!
|
|
pointy
|
posted on 7/5/06 at 06:23 AM |
|
|
In reply to rjs..Norwich.
andy p
|
|
bug1
|
posted on 7/5/06 at 09:20 AM |
|
|
Hi I am a new luego owner I only picked my car up on march 16 what a close call that was dicided to get body at the same time but didn't get
given a chassie number must be one of the last if not the last anbody no what i should do about the chassie number?
|
|
keith2lp
|
posted on 7/5/06 at 10:58 AM |
|
|
Velocity
Hi
Velocity finished & on the road, now looking at a change of engine (poss bike over the winter.
Bug1,
The chassis number that Luego gave me was not accepted by the DVLA so they issued me one at the inspection.
Keith
|
|
Danozeman
|
posted on 7/5/06 at 07:14 PM |
|
|
Building Locost. Hopefully be done by mid to end of a summer,
Dan
Built the purple peril!! Let the modifications begin!!
http://www.eastangliankitcars.co.uk
|
|
richwalker
|
posted on 7/5/06 at 08:18 PM |
|
|
Picked up a velocity kit in January. Lots of bits done, need to connect the engine up and start on finishing it off. Would be nice to get it done
before the end of the summer. Just short of the windscreen which luego have the money for!
|
|
Scotty
|
posted on 8/5/06 at 07:19 AM |
|
|
still going .......
PLEASE NOTE! All comments made by this person are to be considered "Tongue in Cheek" and are not meant to be taken seriously in any way - so there!
|
|
Rubin
|
posted on 8/5/06 at 09:17 AM |
|
|
15 months in , can see light at end of tunnel some days and huge list of jobs on others.........anyone else in kent ?
|
|
simonk
|
posted on 8/5/06 at 11:29 AM |
|
|
Viento Build
Started my Viento build about two years ago. Owes me about 125 hours and more cash than I want to admit to my wife. What's left ? Engine and
gearbox to install (Modified longstroke '386' Rover V8 on Edelbrock 500 4 barrel, all ready, just not in yet), Bonnet, scuttle and dash to
fit and wiring to complete. Hoping to running and driving by the end of summer and SVA by the end of 2006. Interested in any common Viento SVA failure
points so that I can address now. Will post photo when I get to a machine with some snaps on.
|
|
richwill
|
posted on 8/5/06 at 01:25 PM |
|
|
Building velocity.
Just installing fuel lines and tank soon be ready to think about fitting engine and box.
I have had the kit for 15 months but struggle to find the time and dont expect to finish for this summer.
|
|
darrens
|
posted on 8/5/06 at 05:19 PM |
|
|
currently at this stage, waiting for exhaust, wheels are on the way, next 10 days I hope, dash and interior to do, wiring to finish, install
megasquirt and program, hopefully done before sun goes.
[Edited on 8/5/06 by darrens]
|
|